top of page
Dropped Kerb Process
01
Council Application
The first step is obtaining planning permission from your local Borough Council. We can assist with requested documentation.
02
Site Inspection
A site survey is conducted to check for underground utilities or trees that may affect the kerb lowering location.
03
Excavation & Base
We excavate to the required depth, installing a reinforced sub-base capable of supporting heavy vehicle weight without subsidence.
04
Kerb Installation
The final installation involves concrete kerbs and resurfacing, ensuring a smooth transition for your new driveway access.
bottom of page